Related News
Historic bridge moved for renovation work
The 107-year-old Zhejiang Road bridge spanning Suzhou Creek was today moved to a repair yard where it will undergo renovations over the next seven months,
Once work is complete, it should be good for another 50 years of service, said officials.
The work will remove rusted components and reduce the bridge’s weight, while maintaining its original structure and appearance.
Starting at 5am, the bridge was first lifted onto a boat, and then transferred onto a truck that took it into a temporary repair yard about 100 meters away.
“Moving is one of the most difficult parts of the project,” project manager Qian Chen told Shanghai Daily. “It involves moving both on the river and on the ground.
“And measures had to be taken to prevent the structure from falling apart during the operation.”
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.