Metro work cuts water
ABOUT 100,000 residents of Zhengzhou, the capital of central China's Henan Province, have been left without water for two days after the city's third largest water plant was forced to stop operations after two pipes were broken.
The Dongzhou water plant was expected to resume normal supplies yesterday, Xinhua reported. Zhengzhou's water authority discovered that a construction team broke two 1.2-meter-diameter pipes on Tuesday morning while installing cables for the Metro system.
The Dongzhou water plant was expected to resume normal supplies yesterday, Xinhua reported. Zhengzhou's water authority discovered that a construction team broke two 1.2-meter-diameter pipes on Tuesday morning while installing cables for the Metro system.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.