Home
禄 City specials
禄 Hangzhou
Bridge update
THE two sections of the under-construction Zhijiang Bridge were successfully jointed together on Wednesday. The seventh bridge across the Qianjiang River is scheduled to open by the end of the year.
The 1,724-meter-long bridge has three lanes in each direction and is designed to operate at around 80 kilometers an hour. It cost about 2.95 billion yuan.
Once completed, traffic from Hangxinjing Expressway and Zhuantang Town can reach Binjiang District 30 minutes faster than before. The bridge will also relieve traffic congestion on Zhijiang Road.
The 1,724-meter-long bridge has three lanes in each direction and is designed to operate at around 80 kilometers an hour. It cost about 2.95 billion yuan.
Once completed, traffic from Hangxinjing Expressway and Zhuantang Town can reach Binjiang District 30 minutes faster than before. The bridge will also relieve traffic congestion on Zhijiang Road.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.