Home
禄 City specials
禄 Hangzhou
Metro Line 5 progress
The first phase of Metro Line 5, from Central Park Station in Yuhang District to Xiangzhang Road Station in Xiaoshan District, is expected to be in operation by the end of 2019.
The 48-kilometer subway runs from Yuhang District in the northwest to Xiaoshan District in the south with 40 underground stations.
The subway will benefit seven districts, Xihu, Gongshu, Xiacheng, Shangcheng and Binjiang, and connect with Hangzhou-Shaoxing Intercity Railway and 10 Metro lines in the long term. The Hangzhou-Shaoxing Intercity Railway will connect Xiangzhang Road Station and Diyang Road Station in Keqiao of Shaoxing. With a total length of 20.3km, the intercity railway will be in operation by the end of 2020.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.