Home
» City specials
» Hangzhou
Metro Line 5 progress
The first phase of Metro Line 5, from Central Park Station in Yuhang District to Xiangzhang Road Station in Xiaoshan District, is expected to be in operation by the end of 2019.
The 48-kilometer subway runs from Yuhang District in the northwest to Xiaoshan District in the south with 40 underground stations.
The subway will benefit seven districts, Xihu, Gongshu, Xiacheng, Shangcheng and Binjiang, and connect with Hangzhou-Shaoxing Intercity Railway and 10 Metro lines in the long term. The Hangzhou-Shaoxing Intercity Railway will connect Xiangzhang Road Station and Diyang Road Station in Keqiao of Shaoxing. With a total length of 20.3km, the intercity railway will be in operation by the end of 2020.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 沪ICP证:沪ICP备05050403号-1
- |
- 互联网新闻信息服务许可证:31120180004
- |
- 网络视听许可证:0909346
- |
- 广播电视节目制作许可证:沪字第354号
- |
- 增值电信业务经营许可证:沪B2-20120012
Copyright © 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.