Home
» City specials
» Hangzhou
Traffic load to be lifted soon
All the elevated roads and ramps of Zijingang Interchange have been put into place at the intersection of Wenyi Road W. and Zijingang Road.
It has long been claimed as the most complicated interchange in the city, as it is the first interchange with both elevated roads and tunnels in eastern China, and the ramps connecting the interchange in six directions. The main elevated road from north to south was opened to traffic on August 10, 2016.
The multi-level interchange started its construction in 2015 and is scheduled for opening by the end of this year. After its full opening, the interchange is expected to ease the traffic burden in the west of the city.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 沪ICP证:沪ICP备05050403号-1
- |
- 互联网新闻信息服务许可证:31120180004
- |
- 网络视听许可证:0909346
- |
- 广播电视节目制作许可证:沪字第354号
- |
- 增值电信业务经营许可证:沪B2-20120012
Copyright © 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.