Related News
Home
禄 City specials
禄 Hangzhou
Tunnel nearly ready
The construction of Zizhi Tunnel, a link between Zijingang Road and Zhipu Road, will be completed by year鈥檚 end, the contractor said.
The 14.4-kilometer tunnel, the longest in Hangzhou, consists of three tunnels and two culverts. It is designed with three lanes each way. When it opens to traffic, roads around West Lake are expected to be less crowded.
With a speed limit of 60 kilometers per hour, the tunnel will take about 15 minutes to drive through. It is expected to go into service in the first half of 2016.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.