Home
禄 City specials
禄 Hangzhou
Western extension planned
Construction of the western extension of Huancheng Road N. Tunnel will begin before the end of the year.
Huancheng Road N. Tunnel was put into use in October 2015 to connect Zhonghe Elevated Road with Qiushi Elevated Road. After completion of the new extension in 2021, the tunnel will be extended westward to Raocheng Expressway. The construction will be divided into two parts: The middle section runs from Gucui Road to Zhonghe Elevated Road, and connects with the existing Huancheng Road N. Tunnel in the east of Zhongshan Road N. The middle section is about 5 kilometers long running along Tianmushan Road.
The west section runs from Raocheng Expressway to Gucui Road, is around 6.7km long. The western extension of Huancheng Road N. Tunnel will be part of a main expressway from west of Hangzhou to Dajiangdong area in the east.
It will be more than 30km long, connecting Xianlin, Xixi Wetland, west of city, downtown, Xiasha and Dajiangdong, including a 4.5km tunnel under the Qiantang River. With a designed speed of 80km an hour, it will take around 25 minutes to commute from the east to the west of the city.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.