Bridge halves slot in place with new tech
TWO halves of the Wenxiang and Lianyang Bridge, each weighing 2,300 tons, were successfully joined to create an overpass on the busy G60 Highway.
The project, located in the Songjiang Industrial Park, used a new bridge-joining technique called 貌swing connection.贸 The procedure didn?t require the closure of the highway below.
The joining took about 12 hours. Each half was swung accurately into place on a giant turntable 6.4 meters in diameter.
The bridge links Songjiang New City with industrial parks in Shanghai?s east.
The project, located in the Songjiang Industrial Park, used a new bridge-joining technique called 貌swing connection.贸 The procedure didn?t require the closure of the highway below.
The joining took about 12 hours. Each half was swung accurately into place on a giant turntable 6.4 meters in diameter.
The bridge links Songjiang New City with industrial parks in Shanghai?s east.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.