Related News
Speed control blamed on malfunction on Line 8 delays crowds of commuters
BIG crowds of commuters were stranded along stations on Metro Line 8 during rush hours this morning as the result of speed control of the service blamed on malfunction of the signal system.
Due to breakdown of some signal equipments, speed control was adopted on Line 8 service for more than three hours this morning, affecting morning commuters.
The equipment problem is reported to occur on the stretch between Shendu Highway and Oriental Sports Center stations, according to Metro operator.
The problem was announced by the Metro operator on Weibo at 5:25am and was fixed at 8:25am.
To ensure safety, intervals between trains had to be extended during the speed control period as manual driving mode was adopted, said the operator.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.