Home » Metro » Public Services
Metro operator gears up for construction of Line 9 extension
COnstruction of the eastern extension of Metro Line 9 will begin soon.
Work is expected to be completed by the end of 2017, adding another 17 kilometers of track and 10 stations.
Pudong New Area’s Jinqiao area will be covered by the extension, which will start from Yanggao Road M. Station and end at Caolu Railway Station.
According to an earlier blueprint, the extension will pass through Luoshan Road and Jinqiao Road viaducts, the Outer Ring Road in Pudong and the Pudong canal. The 10 new stations will link with lines 12, 14 and the yet to be approved Line 19.
Line 9 currently connects Pudong to downtown Madang Road, Xujiahui and Yishan Road before veering southwest to Songjiang District.
Meanwhile, new standards have been established for the trial operation of new subway lines.
A new line should have at least a 3-month testing period before opening to the public, according to the new standards. In the first 90 days of operation, the interval between trains should be no more than 15 minutes, and no more than 10 minutes in rush hours on downtown area routes. Trains should also operate at least 12 hours a day during trial operations.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 沪ICP证:沪ICP备05050403号-1
- |
- 互联网新闻信息服务许可证:31120180004
- |
- 网络视听许可证:0909346
- |
- 广播电视节目制作许可证:沪字第354号
- |
- 增值电信业务经营许可证:沪B2-20120012
Copyright © 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.