Home » Metro » Public Services
Minpu Bridge structure done
THE main structure of the Minpu Bridge II, the city's first two-deck bridge across the Huangpu River, was completed on Saturday.
Some 4,800 meters long, it links the Minhang and Fengxian districts. Its upper level is a two-way, four-lane highway, and the lower is for Metro Line 5. The highway is to open before the Chinese New Year; the entire bridge, before the 2010 sWorld Expo.
Some 4,800 meters long, it links the Minhang and Fengxian districts. Its upper level is a two-way, four-lane highway, and the lower is for Metro Line 5. The highway is to open before the Chinese New Year; the entire bridge, before the 2010 sWorld Expo.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 沪ICP证:沪ICP备05050403号-1
- |
- 互联网新闻信息服务许可证:31120180004
- |
- 网络视听许可证:0909346
- |
- 广播电视节目制作许可证:沪字第354号
- |
- 增值电信业务经营许可证:沪B2-20120012
Copyright © 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.