Home 禄 Metro 禄 Public Services
鈥楽panish platform鈥 for Line 8
THE third phase of the construction of Metro Line 8 will start this year. Newly designed platforms will enable commuters to get off from the trains from both sides.
The 6.6-kilometer phase with six stops will start from Shendu Highway Station, the current southern terminal of Line 8, and end at Huizhen Road Station.
The section mainly covers the Pujiang Town area in Minhang District.
Structure planning of two stations — Shendu Highway and Sanlu Highway — with new platform designs was announced over the weekend. The design has been nicknamed “Spanish platform,” after a similar design in Barcelona. All six stations of the new phase are elevated. The section will use four-carriage trains.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.