Home 禄 Metro 禄 Public Services
Trial run for city鈥檚 new tunnel
CHANGJIANG Road Tunnel, Huangpu River’s newest and widest tunnel, will undergo trial operations from Saturday, the city’s transport commission said yesterday.
With the newly connected tunnel in operation, residents living in northern Shanghai will have an alternative river crossing, rather than having to rely on the Outer Ring Road Tunnel.
The new tunnel, which is 4,912 meters long, connects Changjiang Road and Shuangjiang Road. It has six lanes and three exits, one on Gangcheng Road in Pudong, the other two in Puxi — one on Changjiang Road W., the other on Jungong Road.
Because of construction of the second phase of Metro Line 10, trucks will not be allowed to use the tunnel from Saturday to November 18.
The operation of the tunnel may be adjusted because of the Metro construction.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.