Lanes closed for bridge repairs
WUSONG Bridge over Yunzaobang Creek in Baoshan District will be partially closed while it undergoes a 12-month renovation program, police said yesterday.
Two of its nine lanes will be cordoned off between 6am and 10pm daily, they said, adding that the bicycle lane will be merged with the pedestrian walkway for the duration of the repair work.
Trucks weighing more than 8 tons will not be allowed on the bridge between the hours of 7am and 9am and 4:30pm and 6:30pm, police said, adding that an exit lane from the Yixian Road elevated highway located close to the bridge will also be closed until next year.
The bridge, which was built in 1898, has been in need of renovation for some time as the volume of traffic it handles is far above its designed capacity.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 娌狪CP璇侊細娌狪CP澶05050403鍙-1
- |
- 浜掕仈缃戞柊闂讳俊鎭湇鍔¤鍙瘉锛31120180004
- |
- 缃戠粶瑙嗗惉璁稿彲璇侊細0909346
- |
- 骞挎挱鐢佃鑺傜洰鍒朵綔璁稿彲璇侊細娌瓧绗354鍙
- |
- 澧炲肩數淇′笟鍔$粡钀ヨ鍙瘉锛氭勃B2-20120012
Copyright 漏 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.