Tunnel work starts
WORK began at the weekend on a tunnel beneath the Yangtze River to connect the Pudong New Area with Baoshan District, which are on different sides of the Huangpu River. The 8.4-kilometer-long tunnel, with three lanes on each direction, is the final project in Shanghai’s Suburban Ring Road. It starts at the crossing of Mudanjiang Road and Fujing Road in Baoshan and returns to land besides the Binjiang Forest Park in Pudong. It’s expected to open in 2019.
- About Us
- |
- Terms of Use
- |
-
RSS
- |
- Privacy Policy
- |
- Contact Us
- |
- Shanghai Call Center: 962288
- |
- Tip-off hotline: 52920043
- 沪ICP证:沪ICP备05050403号-1
- |
- 互联网新闻信息服务许可证:31120180004
- |
- 网络视听许可证:0909346
- |
- 广播电视节目制作许可证:沪字第354号
- |
- 增值电信业务经营许可证:沪B2-20120012
Copyright © 1999- Shanghai Daily. All rights reserved.Preferably viewed with Internet Explorer 8 or newer browsers.